Multi-Gas Source Long-Distance Gas Transmission Pipeline Network-Four Compression Stations Jointly Operated
This calculation example is a set of joint operating conditions after the expansion of the Multiple Gas Sources, Long Distance, Multiple Users gas pipeline network. Natural gas enters the pipeline network from 3 gas sources, is graded and pressurized along the way through 4 compression stations, and is distributed at 2 locations along the line. After the three gas flows are merged, it is distributed to 6 downstream users. The daily transmission volume of the entire network is approximately 67 Million Nm³/D. The model incorporates 3 gas sources, 8 users, 15 sections of long-distance pipelines, 4 compression stations (12 operating units) into the same non-isothermal steady-state calculation, covering three typical engineering problems: multi-gas source supply and demand balance, multi-station joint pressurization and non-isothermal transportation.
Study Overview
| Item | Configuration | Meaning |
|---|---|---|
| Scenario | Four stations plus terminal parallel pipe | Check supply, pressure, temperature at 67 million Nm³/d |
| Boundaries | S₁ pressure; S₂/S₃ and 8 loads flow | Slack source from network balance |
| Compression | NEW, C₁, C₂, C₃; 12 units | Parallel units share station load |
| Pipes | PL₁₃ and PL₁₃F parallel | Hydraulic flow allocation |
| Thermal | Non-isothermal, BWRS | Compression, heat, elevation coupled |
| Results | Network balance → stations → profiles | Global to local checks |
Working Conditions Background and Pipe Network Structure
Origin of Working Conditions
Target delivery is 67 million Nm³/d. Two capacity measures operate together while station inlet and user pressures are checked.
- NEW station boosts the early S₁ branch between PL₁ and PL₂.
- PL₁₃F shares nodes with PL₁₃ to supply D₇/D₈.
The example solves their joint steady-state operating point.
Whole Network Topology

Network topology: NEW on the early S₁ branch, PL₁₃F parallel to PL₁₃.
Gas Transmission Path
| Path | Process and Function |
|---|---|
| S₁ branch (main gas source) | S₁ → PL₁ → NEW Station → PL₂ → D₁ split → Station C₁ → PL₃ → meeting point |
| S₂ branch | S₂ → PL₄ → D₂ distribution → Station C₂ → PL₅, PL₆ → meeting point |
| S₃ branch | S₃ → PL₇ → meeting point (there is no compressor station on this branch) |
| Public booster section | The three airflows merge and enter Station C₃ to provide common pressure support for the two downstream air supply branches. |
| Upper air supply branch | PL₈ → D₃ split → PL₉ → D₄ split → PL₁₀ → D₅ |
| Lower side air supply branch | PL₁₁ is then divided into two paths: PL₁₂ → D₆; PL₁₃ ∥ PL₁₃F parallel section → D₇ split → PL₁₄ → D₈ |
Topology includes auxiliary valves. NEW and C₁ boost S₁ in series; C₂ is on S₂, C₃ follows the three-source junction.
Structural Features
- Staged Supercharging: The S₁ branch is supercharged by NEW and C₁ stations in a relay manner, the S₂ branch is supercharged by C₂, and after the three branches are merged, C₃ is uniformly supercharged. Each station is only responsible for the pressure raising job of this section, and the pressure ratio of a single station is maintained at a low level;
- Parallel Transport: PL₁₃ and PL₁₃F share the transport volume to D₇ and D₈. The flow distribution is determined by the hydraulic characteristics of the two pipelines and the status of the nodes at both ends. There is no need to manually set the diversion coefficient.
Adjustment of the operating conditions of any station will change the pressure and flow distribution of adjacent pipe sections and further affect the inlet status of the downstream station. Therefore, Network-Wide Joint Solution must be used in this calculation example.
Boundary Conditions and Simulation Setup
Simulation Settings and Unit Conventions
| Project | Settings for This Study |
|---|---|
| Simulation type | Steady-state simulation (solving the stable operating state under given boundary conditions) |
| thermal model | Non-isothermal model (coupled solution of pressure field and temperature field) |
| equation of state | BWRS |
| Pipe section friction | Colebrook formula, absolute roughness 0.03 mm |
| Pipe section heat exchange | Buried laying, direct heat transfer coefficient model |
| Gauge pressure reference pressure | 101.325 kPa(a); MPag in the calculation result is MPa(g) gauge pressure |
| Standard status | 101.325 kPa(a), 20 ℃; standard flow unit Nm³/h |
| Actual volume flow | m³/h, corresponding to the actual pressure and temperature of the gas location |
Steady profiles use pipeline distance in km; the timestamp below the title identifies the result frame.
Air Source Boundary: Constant Pressure, Two Constant Flows
| Air Source | Boundary Settings | Inlet Temperature | Air Supply Volume Under This Working Condition (10,000 Nm³/D) |
|---|---|---|---|
S₁(S_1) | The constant pressure is 6.698675 MPa(g) (i.e. 6.8 MPa(a)), and the flow rate is determined by solving | 10 ℃ | 4200 |
S₂(S_2) | Fixed flow rate 625000 Nm³/h | 15 ℃ | 1500 |
S₃(S_3) | Fixed flow rate 416666.667 Nm³/h | 20 ℃ | 1000 |
| Total | — | — | 6700 |
S₁ is the pressure/slack source. S₂/S₃ total about 25 million Nm³/d. Network mass balance gives S₁ supply; PL₁ is about 1.75 million Nm³/h, or 42 million Nm³/d.
Source temperatures are 10/15/20 °C. Composition is tabulated below; junction properties and thermal state follow actual incoming gas.
User Load: Large Users at the Two Terminals Account for 74.6% of the Entire Network
| User | Specified Flow Rate (Nm³/H) | Equivalent Daily Flow Rate (10,000 Nm³/D) |
|---|---|---|
| D₁ | 125000 | 300 |
| D₂ | 41666.667 | 100 |
| D₃ | 208333.333 | 500 |
| D₄ | 208333.333 | 500 |
| D₅ | 1041666.667 | 2500 |
| D₆ | 83333.333 | 200 |
| D₇ | 41666.667 | 100 |
| D₈ | 1041666.667 | 2500 |
| Total | 2791666.667 | 6700 |
The two terminal loads of D₅ and D₈ are each 25 million Nm³/d, which together account for approximately 74.6% of gas consumption in the entire network. When evaluating the conveying capacity in this working condition, the conveying path to the two users and the end pressure level should be checked.
Four-Station Configuration
| Compressor Station | Operating Unit | Number of Units | Speed (R/Min) | Location and Boost Missions |
|---|---|---|---|---|
| NEW station (newly added) | NEW-1~NEW-4 | 4 | 6700 | S₁ Boost pressure in the front section of the branch (between PL₁ and PL₂) |
| Station C₁ | C1-1~C1-3 | 3 | 6800 | S₁ branch D₁ is boosted again after splitting |
| Station C₂ | C2-1 | 1 | 7400 | S₂ branch D₂ boost after splitting |
| Station C₃ | C3-1~C3-4 | 4 | 9200 | Common supercharging after the three-way airflow merges |
Units share station flow in parallel. All use fixed speed and the shared TEST-002 four-station ratio–flow map. Maps and network jointly determine working points.
Pipe Parameters: Length, Diameter, Elevation and Heat Transfer
| Pipe | km | Diameter mm | Wall mm | Elevation m | U W/(m²·°C) |
|---|---|---|---|---|---|
| PL₁ | 100 | 1179 | 20 | 200 → 300 | 2.16 |
| PL₂ | 95 | 1179 | 21 | 300 → 400 | 2.16 |
| PL₃ | 130 | 1179 | 21 | 400 → 100 | 1.75 |
| PL₄ | 48 | 974 | 21 | 80 → 90 | 1.75 |
| PL₅ | 150 | 974 | 21 | 90 → 80 | 1.75 |
| PL₆ | 180 | 974 | 21 | 80 → 100 | 1.75 |
| PL₇ | 150 | 976 | 21 | 70 → 100 | 1.75 |
| PL₈ | 90 | 981 | 17.5 | 100 → 110 | 1.75 |
| PL₉ | 100 | 981 | 17.5 | 110 → 130 | 1.75 |
| PL₁₀ | 100 | 981 | 17.5 | 130 → 100 | 1.75 |
| PL₁₁ | 200 | 991 | 12.5 | 100 → 200 | 1.75 |
| PL₁₂ | 100 | 991 | 12.5 | 200 → 10 | 1.75 |
| PL₁₃ | 90 | 773 | 20 | 200 → 170 | 1.75 |
| PL₁₃F | 90 | 773 | 20 | 200 → 170 | 1.75 |
| PL₁₄ | 50 | 771 | 21 | 170 → 80 | 1.75 |
Pipeline parameters exhibit the following three sets of characteristics:
- Diameters. S₁ uses DN1200 class, downstream DN1000, terminal DN800.
- Elevation. PL₃ drops 300 m, PL₁₂ 190 m; PL₁₁ rises 100 m. Falling elevation offsets part of friction loss.
- Heat. PL₁/PL₂ use U=2.16, others 1.75 W/(m²·°C). Temperature reflects pressure drop and soil exchange.
Gas Composition: the CO₂ Content of S₂ Is Significantly Higher
| Components | S₁, S₃ Content (%) | S₂ Content (%) |
|---|---|---|
| CH₄ | 95.92 | 96.05 |
| C₂H₆ | 1.88 | 0.77 |
| C₃H₈ | 0.32 | 0.11 |
| CO₂ | 1.37 | 2.87 |
| N₂ | 0.26 | 0.15 |
| Other heavy components | About 0.25 | About 0.05 |
S₂ has about twice the CO₂ of S₁/S₃. After mixing and C₃, PL₈ composition is about 77.78% source gas s1s3 and 22.22% s2; chemical CO₂ is about 1.7033 mole%. BWRS uses mixed composition and local state.
Operational Constraints
| Constraint | Limit |
|---|---|
| Station suction | ≥6 MPa(g) |
| User pressure | ≥5.5 MPa(g) |
| Design pressure | 10 MPa |
| Compressor point | Allowed operating region |
These are engineering check requirements. Compare results with each limit after completion.
Steady State Calculation Results and Analysis
Network Supply and Demand
Total supply is about 2.7917 million Nm³/h, matching eight loads at displayed precision. Mixed gases can have different standard densities; use mass flow for strict conservation.
Representative Units
| Unit | Nm³/h | Suction MPag | Discharge MPag | Ratio | Shaft kW |
|---|---|---|---|---|---|
| NEW-1 | 437499.92 | 5.78661 | 6.89366 | 1.1880 | 2082.86 |
| C1-1 | 541666.55 | 6.01655 | 6.95528 | 1.1534 | 2131.95 |
| C2-1 | 583333.33 | 5.89749 | 6.99182 | 1.1824 | 2860.65 |
| C3-1 | 656250.00 | 6.26720 | 8.56016 | 1.3600 | 5894.44 |
All four compress actively. Four C₃ units total about 2.625 million Nm³/h; all 12 units total about 41.17 MW. C3-1 rises from 12.41 to 51.79 °C, followed by pipeline cooling. Power is per unit; ratios use absolute pressures.
Pipe and Terminal Pressures
PL₁ port temperature falls 10.00→6.16 °C. Profile samples differ from port blocks (about 9.92 °C at 0 km). Soil is 8 °C; heat loss changes from +15.86 W/m at start to −1.93 at 50 km, indicating local reversal of heat direction.
PL₁₃/PL₁₃F each carry about 541700 Nm³/h, sharing about 7.08680→6.57709 MPag and 509.71 kPa drop. Equal parameters/boundaries give near-equal split.
Engineering Constraint Checks
| Location | Actual MPag | Required | Margin MPa |
|---|---|---|---|
| NEW suction | 5.78661 | 6.00 | −0.21339 |
| C₂ suction | 5.89749 | 6.00 | −0.10251 |
| D₅ | 5.72920 | 5.50 | +0.22920 |
| D₈ | 5.34458 | 5.50 | −0.15542 |
Margin is actual minus required. Delivery is met, but NEW, C₂, and D₈ are below pressure requirements. Also check design pressure, operating region, temperature, and power.
Results Viewing Process
- Open the four-station example and completed non-isothermal steady job; inspect residuals if needed.
- Check station flow/ratio/temperature/power and PL₈ gas/species.
- View PL₁ pressure, temperature, soil, and heat profiles; compare parallel-pipe blocks.
- Check NEW/C₂ suction and D₅/D₈ pressures against limits.
See Run and View Results for profiles and data blocks.
Extended Comparison Conditions
On the basis of understanding the current working conditions, the model can be copied, only one type of parameters can be modified at a time, and the propagation rules of parameter changes to the entire network can be analyzed:
| Compare Settings | Key Observation Objects | Analyze Goals |
|---|---|---|
| Changing the specified air supply volume of S₂ or S₃ | S₁ flow rate, branch flow rate and inlet pressure of each station | The redistribution rules of air supply jobs between air sources |
| Adjust the rotation speed or unit input combination of a certain station | The station’s pressure ratio, shaft power and downstream user pressure | The impact of the adjustment of the boosting scheme on the gas supply status of the entire network |
| Modify pipeline parameters of PL₁₃ or PL₁₃F | Two-way split ratio, pressure drop and D₈ pressure | Effect of parallel conveying parameters on terminal air supply |
| Change the gas consumption of D₅ or D₈ | Terminal pressure, upstream transmission volume and station operating conditions | Transmission rules of local demand changes along the pipeline network |
| Change the air source temperature or pipe heat exchange conditions | Temperature, density, actual flow and pressure drop | Effect of thermal conditions on long-distance transportation |
This example focuses on the non-isothermal Steady State analysis. If you need to study the gas supply changes after the unit starts and stops, load changes suddenly, or the compressor station shuts down, you can create another Transient working condition based on this model and set the corresponding time series boundaries.