Large Gas Storage Gas Injection and Compression Station - Multi-Unit Joint Pressurization

This example shows the Multi-unit parallel splitting, single branch two-stage boosting and multi-outlet gas injection of a large gas storage gas injection station. The model is equipped with 8 two-stage piston compressor units and a booster branch composed of two centrifugal compression stages connected in series. The incoming air and air injection main lines are connected through the station header and valve group.

Load 3 supplies about 7.30 MPa(g). Two centrifugal stages and piston units 4, 6, 8 boost into N-end A/B equally. Total is about 1.0157 million Nm³/h (24.3777 million Nm³/d). TX is standby; S-end injection is zero.

Study Overview​

ItemConfiguration/resultCheck
ScenarioIsothermal steady injectionSupply/backpressure operation
Equipment8 two-stage piston units, 2 centrifugal stages, headers/valvesConfigured versus flowing units
SupplyLoad 3: 1015739.22 Nm³/h; TX: 0Actual source
BoostingCentrifugal plus piston 4/6/8Load sharing
InjectionN A/B: 507869.61 each; S: 0Backpressure/path relation
Thermal20 °C, BWRSReal-gas hydraulics
ResultsBalance → stages → split → power → convergenceStation interpretation
ScopeMain flow and active unitsSeparate isolated pressure references

Working Conditions Background and Site Structure​

Gas Injection Operation Job​

Gas injection in the gas storage requires increasing the gas from outside the station to the pressure required by the gas injection main line. The inlet pressure, outlet back pressure, unit capacity and station resistance jointly determine the achievable gas injection volume; after multiple units are put into operation, the flow will be redistributed among different booster branches.

Supply about 7.30 MPag enters N-end lines at 24.82 MPag. Compressor discharge must exceed injection boundary pressure to cover downstream losses.

Whole Site Topology​

Full storage injection station topology
Full storage injection station topology

Supply and inlet valves are left, centrifugal/piston branches center, export and injection lines right. Flowing branches are identified in results.

Main Gas Transmission Routes​

PathProcess and Function
main air supply pathManifold 3 → Incoming gas connecting pipe section and inlet manifold → Each booster branch
Centrifugal booster branchCentrifugal compressor - first stage → interstage connection and check component → centrifugal compressor - second stage → outlet header
Piston booster branchUnit inlet → first level of the unit → inter-stage connection → second level of the unit → outlet header; branches of each unit are connected in parallel
N-terminal gas injection pathOutbound pipeline and valve group → Section A and Section B of the N-end gas injection trunk line
Other connectionsAir comes from the TX line, air goes to the TX line after supercharging, air injection at the S end, and branches such as venting and leakage; the actual flow status needs to be checked with the results.

Some valves and connection components are omitted in the table, and the complete connection relationship is subject to the model.

Series Boosting and Parallel Shunting​

The two stages in a single booster branch are connected in series to bear the continuous pressure rise. The same gas passes through the first and second stages in sequence, and is only counted once when counting the branch output; the shaft power of the two stages can be added to represent the shaft power required for compression of the branch.

The centrifugal branch is connected in parallel with multiple piston units to jointly bear the gas injection flow. Each branch is connected to the station header, and its flow rate is affected by unit characteristics, rotation speed, valve status and connection resistance. The two compression stages of the centrifugal branch cannot be repeatedly measured as two independent parallel branches.

Boundary Conditions and Simulation Setup​

Simulation Settings and Unit Conventions​

SettingValue
SimulationSteady-state
ThermalIsothermal, 20 °C
EOSBWRS
GasComponent gas 1, pure methane (CH₄ mole fraction 1)
Gauge reference101.325 kPa(a)
Standard state101.325 kPa(a), 20 °C
PressureMPag = MPa(g)
FlowStandard Nm³/h
RatioAbsolute outlet/inlet
Speedr/min; 1 r/s = 60 r/min

All data belong to the same steady scenario. Inspect states in blocks and convergence in residuals; recalculate after boundary/unit changes.

Ports remain 20 °C. Piston power follows adiabatic compression; centrifugal points follow maps/network. Non-isothermal cases with appropriate parameters are needed for rise, intercooling, or discharge temperature.

Incoming Gas and Gas Injection Pressure Conditions​

LocationMPa(g)Role
TX supply1.8987Retained low-pressure supply, zero flow
Load 37.2987Main source
Boosted export to TX2.8987Zero-flow standby, numerical isolated pressure
N A24.8187Active injection
N B24.8187Active injection
S25.0387Higher-pressure outlet, zero flow

Supplies/injection outlets use pressure boundaries. TX export uses zero flow on a standby branch. Isolated pressure reference is only for solving that subnetwork.

The S end pressure is 0.22 MPa higher than the N end. The outlet pressure difference will affect the flow distribution together with the branch resistance and valve status; two outlets with the same pressure will not split the flow equally in all working conditions.

Unit Configuration and Current Speed​

EquipmentConfiguration/resultInterpretation
Piston8 two-stage units, 16 stagesNot all carry flow
Units 4/6/8Request 3000 r/min; first actual 2894–2895, second 2744–2745Each stage limited to 4000 kW
Units 1/2/3/5/7Both stages off; zero flow/speed/powerInactive
Centrifugal branch2 serial stagesInterstage connection
Centrifugal speedsBoth 8856 r/minJoint boost
Valves/checksInlet/interstage/outlet/branchesConnectivity and local losses

Use compression flow, actual speed, and power to identify active boosting. Stopped equipment can have a pressure difference. Interpret isolated pressures with log warnings.

Steady State Calculation Results and Analysis​

Station Flow Balance​

BoundaryMPa(g)Nm³/h
Load 3 supply7.2986751015739.22
TX supply1.8986750
N A24.818675507869.61
N B24.818675507869.61
S25.0386750
TX exportNumerical reference0

A/B total 1015739.22 Nm³/h matches supply. S/TX flows are zero.

Two-Stage Compression and Load Sharing​

StageSuction MPagDischarge MPagNm³/hShaft kW
Piston 4 stage 17.2735613.58853202996.434000.00
Piston 4 stage 213.5885324.90807202996.434000.00
Centrifugal 17.2726513.86179406956.0510037.42
Centrifugal 213.8564924.90366406956.059485.77
BranchNm³/hTwo-stage shaft kW
Centrifugal406956.0519523.19
Piston 4202996.438000.00
Piston 6202893.378000.00
Piston 8202893.378000.00
Total1015739.2243523.19

Centrifugal supplies 40.07%, pistons 59.93%. Count each serial branch flow once and add stage powers. Centrifugal interstage loss is about 5.30 kPa. All active piston stages reach 4000 kW and stay below requested 3000 r/min.

Isolated-Branch Pressure Reference​

Zero-flow TX export lies in an isolated network without a pressure boundary. The solver establishes 2.8987 MPag as numerical reference, with zero flow. Pressure, density, and inventory depend on it; inspect valve paths and physical pressure boundaries before interpreting them.

Results Viewing Process​

  1. Open the station and trace supply, compression, and N injection paths.
  2. Select completed job; inspect isolated-subnetwork warning and steady residuals.
  3. Check boundary flows and unit-4/centrifugal stage pressures/powers.
  4. Compare active piston speeds/power limits and sum branch flow against N A/B.

See Run and View Results for jobs and blocks.

Extended Comparison Conditions​

After copying the model, each time you modify one type of condition and solve it again, you can use the results on this page as a comparison point.

Compare SettingsKey ObservationsAnalyze Goals
Change the incoming air pressure of sink 3The inlet pressure, pressure ratio, shaft power and gas injection volume of each unitThe influence of incoming air pressure changes on combined supercharging
Adjust the N-end or S-end gas injection back pressureOutlet flow, header pressure and load of each branchThe relationship between gas injection pressure conditions and achievable delivery volume
Change the input combination of piston unitRemaining unit flow, centrifugal branch working status, total gas injection volumeLoad redistribution under shared header conditions
Changing the operating conditions of the centrifugal branchTwo-stage working point, piston branch branch flow and total shaft powerOperational coordination between different types of equipment
Adjust the piston unit speedBranch flow, interstage pressure and two-stage shaft powerTwo-level coordination and volume adjustment effect
Adjust valve opening or connect passagePressure difference before and after the valve, branch flow and flow directionEffects of station resistance and channel selection on gas injection distribution
Set TX line external output requirementsOutput volume, N-end gas injection volume and unit loadInteraction between external transmission and gas storage gas injection jobs

This example shows isothermal steady-state operation at given boundaries. The gas storage pressure changes with the gas injection time, the unit starts and stops, and the valve switching process requires the configuration of corresponding transient boundaries and control; the analysis of compression temperature rise and cooling load requires a non-isothermal model and supporting thermal parameters.