Compare Simulation Results
When comparing different working conditions, different parameters or different control schemes, you can use the same set of trend charts and dashboard configurations for multiple jobs, and then switch jobs one by one to check the results.
"Load other job configurations" copies the results viewing method, not the job's model, parameters or calculation data. The current page will not automatically merge the results of multiple jobs into a cross-job curve, or automatically generate a difference report. A reliable approach is to first fix the comparison scope and then use a consistent chart configuration to view each job.
Before Comparing, Confirm Whether the Jobs Are Comparable
Before starting, let’s clarify the questions to be answered in this comparison. For example: "After the valve opening is changed, does the outlet pressure peak decrease?" It is easier to choose the right variables and time range than "See what is the difference between the two jobs?"
It is recommended that the following conditions be met at the same time:
- Each job has results that need to be compared. While the job is still running, the curve may continue to refresh. Do not regard the current end point as the final result.
- Except for intentionally changed conditions, model topology, component parameters, and global parameters should be kept as consistent as possible.
- What is being compared is the same physical location, the same variable meaning, and the same units, not just two curves with similar names.
- The horizontal axis has the same meaning. For example, both use time as the horizontal axis, or both use mileage as the horizontal axis; do not directly compare the peak position and change speed on different horizontal axes.
- Time start time, end time, sampling interval or output step size are suitable for analysis together.
If the above conditions cannot be met, the jobs can still be observed separately, but they should be regarded as two independent calculation examples, and conclusions about the influence of parameters cannot be drawn based solely on the height of the curve.
Use Clear Names for Jobs
New jobs usually use default names such as "Compute Task_1" and "Compute Task_2". Double-click the name on the job card and change it to a short name that describes the condition, such as "Baseline Condition," "Valve Open 60%," "High Inlet Pressure."
Only the conditions for this active change are written in the name. If there are many conditions, record the model name, job creation time and key parameters separately to avoid too long names in the job list.
Check Model Snapshots for Each Job
Each job uses a snapshot of the model saved when starting the calculation. Modifications made to the model after the job is created will not be reflected in existing jobs. Therefore, two jobs under the same model do not necessarily use the same topology and parameters.
Open the jobs to be compared in turn and check in the read-only job view:
- Whether all key components exist and whether the connection relationships are consistent.
- Whether the components being compared are located in the same location and play the same role.
- In addition to the parameters planned to be changed, whether other key parameters are consistent with global parameters.
- Whether the jobs use the same computational phases and boundary conditions.
The same component display name does not necessarily mean that it is the same component. When loading data blocks and chart configurations, the page also needs to find the target data based on the component identifier and result item. If a component has been deleted and then re-added, the original result configuration may not be retained even if the name is the same.
If the snapshot differences exceed the design of this experiment, it is recommended to return to the model view and recreate the job from the same controlled model rather than continuing the direct comparison.
Prepare Results View in Benchmark Job
Select a job with complete results and clear working conditions as the baseline job, and then configure the results view according to the analysis goals.
Check a Component with a Trend Graph
The trend chart is suitable for observing the changes of variables such as pressure, temperature, flow or opening of a component along the horizontal axis:
- Select the target component in the job snapshot.
- Click "Trend Chart" at the bottom of the page.
- Select the variable tab to be compared and adjust the display range to the interval of interest.
- Use the legend to hide irrelevant curves; adjust the legend name, color, and line width if necessary so that each job uses the same identification method.

Range zoom in trend charts is used to view local details. After loading the result configuration of other jobs, you should still recheck the variable tab and display range, and do not start comparing just because the pictures look similar.
Check Multiple Sets of Variables with a Dashboard
When you need to observe multiple components or multiple variables at the same time, open the "Dashboard" dashboard:
- Add the charts you really need for this analysis.
- Arrange related charts in a fixed order and resize them for easy viewing.
- Put multiple sets of curves into the same chart only if the meaning and units of the horizontal axis are suitable for joint display.
- Use consistent legend names, colors, line weights, and visibility settings for each chart.

The dashboard can display multiple charts within the current job, or display multiple sets of compatibility curves in one chart. The "multiple groups" here still come from the current job and do not mean that data from other jobs have been superimposed.
Load the Configuration of the Baseline Job into Other Jobs
After completing the configuration in the baseline job, perform the following operations for each job to be compared:
- Open the target job.
- Click "Load other job configurations" at the bottom of the page.
- Select the baseline job in Load Job Result Configuration.
- Click "Load" and wait for the page to prompt "Other job configurations have been loaded."
- Open trends and dashboards and confirm that charts, legends, and data are complete.
The pop-up window will only list the jobs in the current job list except the target job. If the baseline job does not appear, first confirm that it is open in the job list on the current page.
The load operation handles the following:
| Configuration | Behavior After Loading |
|---|---|
| data block | Add data blocks for components that can be found in the target snapshot and are not yet monitored; if the corresponding component cannot be found, it will be skipped |
| Dashboard | Use the chart selection and layout of the source job; the original dashboard configuration of the target job will be based on the source configuration. |
| Legend | Use the name, color, line width and visibility settings saved by the source job; the original legend settings of the target job will be subject to the source configuration. |
Result data always comes from the currently open target job. Loading a configuration will not copy the curve values of the source job, nor will it change the snapshots and parameters of the target job. If there is no corresponding component or result item in the target job, the relevant data block, curve or chart may be missing or empty.

Compare Item by Item Using Trend Charts
Trend charts are suitable for answering questions about a single component or a single set of variables. After completing the configuration loading, switch jobs in the job list one by one, keeping the following definition unchanged:
- Select components at the same physical location.
- Open the variable tab with the same meaning.
- Use the same horizontal axis interval and vertical axis units.
- Observe the same metrics, such as peak values, steady-state values, time to target values, or range of fluctuations.
If the horizontal axis ranges of the two jobs are different, you should first confirm whether the difference is due to calculation time or missing data. Don't compare response speed by just looking at the partially enlarged curve shape.
Use Dashboards to Compare Overall Operating Conditions
Dashboards are suitable for checking the linkage relationships between multiple variables at the same time. After loading the same dashboard configuration, you can switch jobs in the same order:
- First look at the boundaries or input variables to confirm that this working condition has indeed changed as planned.
- Look at the key process variables again to determine where the change begins to propagate.
- Finally, look at the target output variable and record the peak value, final value or stable interval.
- Use the same chart order, legend visibility, and observation intervals for each job.
Do not compare values in different units directly. Even if the chart uses dual vertical axes, the corresponding coordinate axes and units should be read separately. You cannot judge which value is greater based on the height of the two lines on the screen.
Align Timeline and Variable Aperture
Record at least the following information when comparing:
| Caliber | Things to Check | Handling of Inconsistencies |
|---|---|---|
| horizontal axis | Time, mileage or other coordinate meanings | Analyze separately without direct comparison of peak position and slope |
| time range | Starting point, end point and valid data interval | Compare only common intervals and indicate the uncovered parts |
| data step size | Sampling interval, output step size | Carefully compare instantaneous peak values and recalculate if necessary |
| variable | Physical meaning, location, direction | Return to the job snapshot to confirm the component and result items |
| unit | The units corresponding to the axis labels and legend | Convert to the same unit first, then record the conclusion |
| parameters | Key inputs other than trial variables | Re-establish controlled jobs when there are too many differences |
The time slider at the bottom of the page is used to view the data blocks and status of the current job at a certain point in time. Placing the sliders of two jobs in the same position will only make them comparable if their time starting points and time meanings are consistent. Trend charts or dashboards should also be based on the actual range displayed on their respective axes.
Record Conclusions Instead of Judging Based on Pictures Alone
It is recommended to leave a brief record of each round of comparison:
- The name and creation time of the benchmark job and comparison job;
- Parameters that were intentionally changed between the two jobs;
- The components, variables, units and horizontal axis intervals being compared;
- Actual readings such as peak value, final value, stable interval, etc.;
- Other differences found in job snapshots;
- Which conclusions still need to be verified by recalculations.
The platform provides curves, data blocks and dashboards for viewing results, but does not determine the causes of differences for users. After seeing the changes, you should first go back to the job snapshot to confirm the input, and then combine the logs to determine whether there is an exception.
Frequently Asked Questions
| Phenomenon | Treatment Method |
|---|---|
| There are no optional jobs in "Load Job Result Configuration" | There is only one job in the current job list, or the source job has not been opened on the current page; first open the job that needs to be used as a baseline. |
| Some data blocks do not appear after loading | There is no component with the same identity in the target job snapshot, or the component already has a data block; check the snapshots of both jobs |
| The dashboard chart is empty or missing curves | The target job does not have a corresponding result item, the result has not yet arrived, or the component and variable definitions of the two snapshots are different. |
| The curve ranges of the two jobs are different | Check the calculation time, horizontal axis type, valid data interval and display zoom range |
| It looks like the same variable but the values are very different. | Check component location, variable orientation, units, boundary conditions, and job snapshot parameters |
| The original layout of the target job changes after loading. | The dashboard and legend will adopt the configuration of the source job; if you need to retain the original configuration, do not load it directly, record the existing settings first |
Related Documentation
- View logs, trends, data blocks and dashboards individually: View and Analyze Simulation Results
- Learn about job reopening, running snapshots, and results retention range: Restore Jobs and Understand Result Retention
- Create a job and view the running status: Create and Control Simulation Jobs